Active Design and Construction Projects

Projects Under Construction

Local Projects

061095 – Replace Building Automation Systems – Academic Buildings

This project is to upgrade building automation systems at all academic buildings.
Estimated project cost – $5,000,000

061096 – Construct New Facilities Storage Building

This project will construct a new facilities building for necessary campus storage.
Estimated project cost – $300,000

061120 / M06731 – Replace Campus Entrance Signage

Design and construction of a replacement entry sign.

061121 – Install E-Charging Stations – BB & TT Parking Lots

Design and construction of E-Charging stations in BB and TT Parking Lots.
Estimated Cost – $45,000

061123 – Minor Critical Maintenance FY 2025-26

This project provides funding for an array of projects for the maintenance and repairs on academic buildings.
Estimated Cost – $950,000

061125 – Replace Chiller – Saratoga Heating Plant

This project will replace critical equipment in order to maintain cooling systems at the Saratoga Terrace Complex.

State University Construction Fund (SUCF) Projects

061016-02 – Sturges Hall Renovation – Phase 2 Fit Out

See link here for information on our Sturges Hall Renovation.
Estimated project cost – $40,000,000

061070 – Reconstruct Underground Electrical & Data Distribution Systems, North Campus

This project is the installation of new electrical duct banks, electrical feeders and replacement of electrical transformers in approximately 15 buildings including residential and academic buildings. This project will also install new networking communication duct bank systems. The project area is approximately from Merritt Athletic Center to Court Street.
Estimated project cost – $29,000,000

Projects Out for Contractor Bidding

Local Projects

061080 – Site Improvements – Mary Jemison Dining Hall

This project will investigate the site conditions on the east side of the building, including drainage, bridge, steps and ramp. This project will look at the improvements needed in this area.
Estimated project cost – TBD

061119 – Rehabilitate Corridor & Replace Bleachers – Merritt Pool

This project is to replace bleachers in the Merritt pool and installation of walls to create a passage corridor.

Projects Under Design

Local Projects

061126/G06077 – Study – Surge Space – College Union & Blake Hall

This project is to conduct a study for relocating use functions, venues and occupants from the College Union and Blake Hall to other locations on campus to prepare for complete building renovations.

D069RD – InfraMappa

This project is to conduct high resolution aerial photography of the campus, GPS all existing utility information and place it all in a software for use by facilities for record keeping

L06148 – Communications A/V Design – Sturges Hall

Audio-Video design services for Communications department at Sturges Hall.

State University Construction Fund (SUCF) Projects

None at this time

Projects Out for Consultant Solicitations

Local Projects

061122 – Rehabilitate Wing A & Demolish Wings B & C – Blake Building

This project involves the design and construction of a complete renovation of Blake Hall, including the demolition of Blake B & C.

061127 – Renovate Locker & Shower Rooms – Merritt Athletic Center

Replace floorings, finishes and fixtures for Merritt locker and shower rooms.

G06076 – Backdrop Term Consultant Services – 2025-2027

This project is to obtain qualifications from design firms in order to have qualified term design consultants on hand for future projects.

State University Construction Fund (SUCF) Projects

061124 – Replace Ice Arena Chiller Systems & Mechanical Systems-Merritt Athletic Center

This project will update and replace end-of-life chiller and mechanical systems for the Merritt Ice Arena.