Projects Completed
Facilities Services
Projects Completed
D069IM - Boiler Repairs-Various Buildings ($5,100)
D069IN - Breaker Replacements-Ontario Hall ($18,800)
D069IO - Fire Alarm Panel Upgrades-South Campus ($23,300)
D069IQ - Repair Onondaga Boiler ($8,700)
D069IR - Exterior Door Replacements-Nassau, Suffolk & Onondaga Halls ($44,900)
D069IS - Replace UPS-Ontario Hall ($12,400)
D069IU - Replace EMS With Carrier DDC System-Livingston & Jones (7/2014, $10,000)
D069IV - Fiber Optic Testing-Fire Alarm Loop #2 (8/2014, $7,300)
D069IW - Carrier Router Upgrade-Various Buildings (8/2014, $6,700)
D069IZ - Carbon Monoxide and Panel Upgrades-Various Buildings (5/2015, $34,600)
D069JA - Upgrade Showers-Nassau & Suffolk (12/2015, $15,100)
D069JB - Glass Replacement at Bridges-Allegany Hall (2/2016, $19,600)
D069JC - Bathroom Shower Upgrades-Onondaga North (3/2016, $27,300)
D069JD - Arc Fault Corrections-Ontario Hall (3/2016, $1,400)
D069JE - Door Replacements-Various Buildings (5/2016, $149,000)
D069JF - Exit Light Replacements-Various Buildings (5/2016, $1,700)
D069JG - Electric Panel Upgrades-Ontario Hall (5/2016, $48,000)
D069JH - Sewer Line Replacement-Onondaga Hall (5/2016, $12,500)
D069JI - ACM & New Flooring-Allegany Hall (6/2016, $24,100)
D069JJ - ACM & New Flooring-Livingston Hall (6/2016, $127,200)
D069JK - DHW Holding Tank Replacement-Putnam Hall (6/2016, $6,600)
D069JL - Ceiling Repairs-Nassau Hall (6/2016, $37,600)
D069JM - Ceiling Repairs-Suffolk Hall (6/2016, $37,600)
D069JN - Glass Replacement at Bridges-Wyoming Hall (7/2016, $25,100)
D069JO - Replace Breezeway Flooring-Livingston & Jones (7/2016, $12,800)
D069JP - Refinish Bathrooms-Onondaga South (7/2016, $86,500)
D069JQ - DHW Tank Replacement-Jones Hall (7/2016, $24,900)
D069JR - Sink Replacements-Steuben Hall (7/2016, $1,400)
D069JT - Replace Circulating Pumps-Allegany & Wyoming (9/2016, $4,400)
D069JU - Replace Domestic Hot Water Tank-Livingston (9/2016, $21,800)
D069JV - A/C Replacement-Saratoga Commons (10/2016, $6,800)
D069JW - Carpet Flooring Replacement-Nassau & Suffolk (11/2016, $18,700)
D069JX - Underslab Waterline Replacement-Jones Hall (11/2016, $22,200)
D069JY - Drinking Fountain Replacements-Phase 1 (12/2016, $18,700)
D069JZ - Lighting Replacements to LED-Phase 1 (12/2016, $6,400)
D069KA - Replace Expansion Tanks-Livingston & Jones Halls (2/2017, $4,800)
D069KB - North Campus Water Service PRV Replacements (3/2017, $8,600)
D069KC - Electric Room Door Replacements-Nassau & Suffolk Halls (3/2017, $19,900)
D069KD - Door Installation-Erie Basement Storage (3/2017, $1,500)
D069KE - Access Control Panel Replacements-Various Bldgs. (3/2017, $28,500)
D069KF - Replace Carpet-Nassau & Suffolk Halls (3/2017, $45,600)
D069KG - Replace Wall Pack Lighting-Various Buildings (3/2017, $51,300)
D069KJ - Replace Bathroom Ceilings and Lighting-Livingston Hall (4/2017, $36,000)
D069KK - Refinish Bathrooms - Onondaga South (5/2017, $125,000)
D069KL - Rehab Sinks, Moldings and Painting - Saratoga (5/2017, $47,000)
M06401 - Door Replacements-Various Buildings ($29,500)
M06402 - Replace Main Electrical Switch-Newton Hall (7/2017, $64,000)
M06403 - Boiler #1 Tube Replacements-Heating Plant ($42,300)
M06404 - Cooling Drive Motor Replacements-Mary Jemison & South Hall ($24,300)
M06405 - Roof and Duct Replacements-Mary Jemison & Milne Library ($9,200)
M06406 - Boiler Return Valve Replacements-Heating Plant ($18,400)
M06407 - Fall Protection Railing-Red Jacket ($31,500)
M06408 - Feed Water System Replacement-Heating Plant ($16,300)
M06409 - Step Replacement-Lauderdale Health ($30,500)
M06410 - Drain Pipe Replacement-Mary Jemison Dining Hall ($25,200)
M06411 - Sidewalk Replacement-Merritt & T-Lot ($5,500)
M06414 - Water Main Replacement-Mary Jemison ($20,300)
M06416 - Hydrant Replacement South of Wayne Hall ($11,000)
M06417 - Loading Dock Replacement - College Union ($17,800)
M06418 - Merritt Pool HVAC Upgrade ($25,600)
M06419 - Water Main Replacement - Erie Hall ($24,000)
M06420 - Emergency Lighting Upgrades-Various Buildings ($25,000)
M06421 - Replace Exhaust Fan and VFD's-Doty Hall ($7,900)
M06422 - Boiler #3 Tube Replacements-Heating Plant ($49,800)
M06423 - Mixing Valve Replacements-ISC ($28,100)
M06424 - Fire Alarm Upgrade - Merritt Athletic Center ($116,900)
M06425 - Water Main Replacement-Genesee Hall ($21,300)
M06426 - Replace Overhead Doors-Clark B ($17,300)
M06428 - Replace Water Heater & PRV-Doty Hall ($10,900)
M06429 - Replace Lighting-Various Buildings ($36,000)
M06430 - Mailroom Flooring Abatement - College Union ($31,200)
M06431 - Replace HVAC Controls-Doty Hall ($35,300)
M06432 - Partial Tile Replacements-Merritt Pool (7/2017, $50,700)
M06433 - Steam Valve Replacements-Heating Plant ($32,400)
M06435 - Chiller Motor Starter Replacements-ISC ($12,900)
M06436 - Sidewalk Replacements (7/2017, $12,300)
M06437 - Roof Replacements-Bldgs. 36 & 43 ($50,200)
M06438 - Carbon Monoxide Detection-ISC & Greene Hall ($63,400)
M06439 - Door Replacements-Clark A & B ($12,900)
M06440 - Recital Hall A/C Replacement-Doty Hall (7/2017, $5,000)
M06441 - Carbon Monoxide Detection-Mary Jemison ($11,900)
M06442 - Carbon Monoxide Detection-Letchworth Dining Hall ($14,000)
M06443 - Sidewalk Replacements-Milne & Blake ($12,700)
M06444 - Fire Alarm Replacement-College Union (8/2017, $61,700)
M06445 - Water Main Replacement-Steuben Hall ($16,800)
M06446 - Replace Multistack Chiller Controls-Bailey Hall ($5,200)
M06447 - Exterior Sanitary Sewer Replacement-Sturges Hall (3/2017, $64,200)
M06449 - Replace Chiller-College Union (3/2017, $150,000)
M06456 - Paver Replacements - College Union Plaza (5/2017, $15,000)
M06457 - Sidewalk Replacements - Livingston, Allegany & T-Lot (5/2017, $7,100)